-
All Categories
all-categories
-
- SonoCon Soundwall Systems
- SonoCon High Performance (HP) Sound Absorption Panels(5)
- SonoCon SC Acoustical Panels and Enclosures
- Exterior Acoustical Panel Systems
- SonoCon Class 3 Preassembled Noise Control Structures
- Acoustical Test Chambers
- SonoCon Industrial Silencers
- SonoCon Acoustical Louvers (6)
- Acoustical Doors and Windows (14)
- SonoCon Softwall Sound Control Materials
- Schema Series Acoustical Panels
-
In determining the scope of work required to meet the operating requirements for a critical environment including equipment required and room characteristics, the following minimum criteria and check list are relevant to a variety of applications:
- Equipment and processes to be employed.
- Material classification and characteristics.
- Room specification: humidity and temperature tolerances.
- Cleanliness demanded by the activities.
- Fire, corrosive or toxic hazards present.
- Electrical power / devices necessary.
- Telephone, and other communication equipment / wiring.
- Number of personnel using the new facility.
- Ambient temperature / humidity within the existing building.
- Waste heat from such equipment as ovens and motors.
- Existing available air conditioning equipment.
- Room wall, ceiling and floor finishes.
- Types of fire suppression systems permissible or compatible.
- Available utilities such as power, water, drainage.
-
APPLICATION SPECIFIC STRUCTURES include:
- Engineering - Factory Fabrication - Installation
- Exterior and Interior Applications
- Permit Series prefabricated conference and meeting rooms
- Factory Fabricated Multi-function Facilities
- Mezzanine and Elevated Structures
- Vertical Reciprocating Conveyors (also called Vertical Lifts)
- Pre-assembled Power Centers and PLC Enclosures
-
We engineer to:
- NEC Classification (Class, Division)
- Electrical Requirements per NEC classification
- Make Up Air and Purging Requirements
- Access Requirements
- Preferred Construction Materials (Noncombustible, Fire resistance ratings)
- Size
- Preferred Building / Room Layout / Location
- Utilities
- Ventilation / Filtration
- Temperature and Humidity Control
- Alarm Systems
- Secondary Containment
- Sound Control
- Ballistics
- Explosion Proof